Jun 29, 2022This project was a retrofit of three buildings, totaling 50 stories, representing one million square feet. It was a major mechanical and control upgrade focusing on tenant comfort and energy […]
Read more
Jun 29, 2022This project was a retrofit of four elementary school buildings in the district, ranging from 70,000 sq ft to 104,000 sq ft, with up to two levels each. The District […]
Read more
Jun 28, 2022The project was a retrofit of multiple building segments including office areas and shop areas. The MNDOT was also especially concerned with control of comfort levels within the building. The […]
Read more
Jun 28, 2022Ottawa Train Yards is Ottawa’s first centrally located retail power center and office development; it houses over a half million square feet of retail space, covering over 92 acres of […]
Read more
Jun 27, 2022When Public Health Ontario (PHO) relocated its largest laboratory from Etobicoke to the MaRS Discovery District in downtown Toronto, Modern Niagara provided the fit-up of an integrated, state-of-the-art Building Controls […]
Read more
Jun 27, 2022A web-based EC-NetAX platform was used to integrate HVAC and lighting control, utility monitoring, and multiple environmental sensors. The project was designed and implemented according to LEED guidelines. The new […]
Read more
Jun 27, 2022Federal Office Building 8 (FOB8) is a 547,000-sq-ft 1960s-era laboratory building that was transformed to Class A office space and features new architectural accents, such as glass atriums.The project involved […]
Read more
Jun 24, 2022This project was a retrofit of 3 school buildings within the District, during which the facilities were occupied, requiring minimization of down time of mechanical equipment. The EC-NetAX Web-based building […]
Read more
Jun 24, 2022This project was a retrofit of an existing school building. The Building Automation System was designed to accommodate the planned future expansion without any modification, but to still operate air […]
Read more
Jun 24, 2022The project included three five-story buildings, representing 242,000sq ft. The project involved converting a historical warehouse and machine repair facility, and retrofitting into labs and office spaces. The project included […]