Ottawa Train Yards

Ottawa Train Yards is Ottawa’s first centrally located retail power center and office development; it houses over a half million square feet of retail space, covering over 92 acres of […]
Read more

Reliable Controls HQ Annex

The Reliable Controls® HQ Annex is a naturally ventilated LEED Platinum targeted facility, designed to operate using 50% less energy than the ASHRAE 90.1(1999) standard. LEED points were achieved in […]
Read more

River Rock Casino Resort

The River Rock Casino Resort complex was completed in August of 2005 and runs entirely on the BACnet® protocol. All MACH-Global™ controllers communicate over IP via a LAN belonging to […]
Read more

Shangri-La

About the Hotel: Set in Vancouver’s downtown core at the intersection of West Georgia and Thurlow Street, Shangri-La Hotel, Vancouver occupies the first 15 floors of a new 61-story landmark […]
Read more

Metropolis at Metrotown

The Reliable Controls® MACH-System installed at Metrotown controls the HVAC in twin 30-storey office towers, exhaust systems for a one million square foot parkade, controls four boiler plants and six […]
Read more

Balfour Building

Designed in 1930 by the world renowned architect Benjamin Brown, the Balfour Building stands as one of the premier historical structures in the heart of downtown Toronto. Located on the […]
Read more

The Centre for Applied Technology

The Centre for Applied Technology (CAT) is the largest building on Northern Alberta Institute of Technology’s (NAIT) Main Campus, covering 51,600 square meters while hosting approximately 5,000 full-time students. CAT […]
Read more

MaRS Phase II - Public Health Ontario

When Public Health Ontario (PHO) relocated its largest laboratory from Etobicoke to the MaRS Discovery District in downtown Toronto, Modern Niagara provided the fit-up of an integrated, state-of-the-art Building Controls […]
Read more

Laval High School

A web-based EC-NetAX platform was used to integrate HVAC and lighting control, utility monitoring, and multiple environmental sensors. The project was designed and implemented according to LEED guidelines. The new […]
Read more

Elizabeth Park Elementary

This project was a retrofit of an existing school building. The Building Automation System was designed to accommodate the planned future expansion without any modification, but to still operate air […]
Read more
arrow-l-bluearrow-l-warrow-larrow-rarrow-whitecaret-down-hovercaret-downchevron-down-wchevron-downchevron-leftchevron-rightcircle-xclose-menuclosedot-w-actdot-wexternalfacebook-squarehamburgerinstagram-squarelinkedin-squarelist-polygonminuspausepinplayplussearch-greensearchtopic-icontwitter-squarexyoutube-square