For more than 30 years, OPTODEV Inc., a subsidiary of Essilor International, one of the leading global players in health care, has been a producer of high index ophthalmic lenses and ophthalmic optical equipment for the medical sector. Their plant in metro Manila, Philippines is considered a ‘Center of Manufacturing Excellence’ and mass produces much of Essilor’s more notable brands such as Varilux®, Crizal®, and Xperio®.

OPTODEV’s nearly 130,000 sq. ft. plant is categorized as a class 1000 cleanroom manufacturing facility and comprises a ground floor, mezzanine, and third floor. Goods produced at OPTODEV must be protected from contamination of particles and microorganisms from production to packaging. Therefore, the facility must offer unprecedented systems control and clean indoor air quality (IAQ) to meet strict FDA guidelines and ANSI standards for commercialization abroad.

Such sophisticated requirements can be very energy-intensive on the facility and taxing on personnel. Historically, the buildings electromechanical, manually-operated HVAC system used a substantial amount of energy to effectively ventilate and eliminate airborne contaminants to meet clean room standards. Further, the company had, for many years, manually monitored their clean environments with traditional chart recorders. These systems and processes were highly inefficient and lacked any sort of alarm mechanism to alert personnel to out-of-specification building conditions.

In search of ways to significantly reduce both energy costs and time spent manually monitoring environmental conditions of the building, OPTODEV turned to an energy management contractor, Asyst Power Technologies. The challenge- Develop a retrofit master plan (four phases) to replace individual, antiquated systems with a fully-open, interconnected BACnet building automation system (BAS). Asyst began by retrofitting the manually-operated HVAC system with a fully automated DDC system flexible enough to address all specific requirements of system equipment (AHUs, boilers, chillers, etc).

Initial operating costs savings were estimated at 20% annually, with actual measured costs metrics for the first year showing closer to 25% savings.

“We chose to switch our offering to KMC Controls due to their highly interoperable and reliable BACnet product line, and also for their renowned product support,” commented Liberato Donato, VP of Operations at Asyst. He went on to say, “Our customer wanted more energy savings, but we had squeezed all we could out of the original system. We needed a more capable solution.”

Asyst initiated Phase II of the project which expanded the overall building system and seamlessly integrated the original system with the more capable KMC BACnet system. Through the installation of a number of BTL-listed, KMC BACnet Building Controllers (B-BC), expansion modules, electronic actuators and sensors, as well as, the improved customization of control sequences, Asyst was able to better optimize and fully automate complex control functions of the entire building management system. The system more closely monitors and controls the conditioning and use of outside air and better detects and adjusts air-handling devices based on predetermined setpoints and other occupancy conditions. Because the facility runs around the clock, the system’s responsiveness is vital to overall performance and energy efficiency.

All of Phase II process and control upgrades were accomplished while the plant remained at full capacity without any interruption in production and plant cooling. Preliminary savings projections were estimated at an additional 10-15% in operating costs, with initial results indicating savings more in the 15-20% range. The plant has expanded capacity by over 20% in last two years, while measured energy cost metric (KWH/GLC) has dropped by over 20%. Also, due to the automation of data gathering required for regulatory compliance, two plant technicians have been able to be reassigned to more technical tasks.

The flexibility provided by KMC’s building automation and control solutions was exactly what was needed at OPTODEV, Inc. “Our highest priority was to find a local systems integrator who could provide reliable hardware and flexible software to meet the needs of our complex sequence of operation, as well as our monitoring and alarming needs,” commented Herman Robles, Head of Maintenance at OPTODEV Inc. “KMC Controls and Asyst Power Technologies have met all of these challenges, and provided us a intuitive, simple to understand GUI,” he added. By creating an open and sustainable BACnet building automation system, KMC and Asyst have provided for a modern-day level of data input, reduced overall operating costs and have laid the groundwork for future upgrades.

Future plans (Phases III – V, to be completed by Y/E 2012), include the construction of a new 90,000+ sq. ft. facility to expand OPTODEV’s manufacturing space. Further BACnet control via KMC building controllers will be required in the chilled water plant to manage the 400-ton York and 300-ton Carrier machines, associated pumps, cooling towers, and other process water equipment. A KMC Modbus/BACnet gateway is planned to integrate over 30 submeters into the system for monitoring and plant power control purposes.
Also in Phase III, the KMC TotalControl web-based workstation will replace the existing operator workstation allowing for improved data-handling capabilities, trending analysis, and automated alarm notifications to facility engineers. TotalControl will also make it possible to record and produce reports denoting exact compliance with, and deviation from, the specified room conditions (e.g. pressure, temperature and humidity).

In the final analysis, more than 2,000 data points will allow operators to have access to and receive information from all integrated systems.

Number of Buildings1
Total Area130,000
Products/Equipment Installed

KMC BACnet Building Controllers
KMC B-BC Expansion Modules
KMC Electronic Actuators
KMC Sensors
York Chiller
Carrier Chiller

Systems IntegratedChiller, HVAC, VAV, Laboratory, Power Monitoring
Number of Devices65
System Points2,000
System IntegratorAsyst Power Technologies
Controls ContractorAsyst Power Technologies
Controls ContractorCarrier, KMC Controls
OtherYork
arrow-l-bluearrow-l-warrow-larrow-rarrow-whitecaret-down-hovercaret-downchevron-down-wchevron-downchevron-leftchevron-rightcircle-xclose-menuclosedot-w-actdot-wexternalfacebook-squarehamburgerinstagram-squarelinkedin-squarelist-polygonminuspausepinplayplussearch-greensearchtopic-icontwitter-squarexyoutube-square